Public subsidy Vienna · checked on 16 October 2026
Heat pump grant Vienna 2026
Vienna supports switching to a heat pump with a public grant of up to 8.000 € from federal state funds (air source heat pump; ground source up to 12.000 €). On top of that, there is the federal Kesseltausch (boiler replacement) scheme for detached/semi-detached houses and terraced houses: a flat rate of up to 5.000 € for heat pumps, registration by 31 December 2026 at the latest. Here you can find out what the federal state pays, when you apply and where.
The most important facts in brief
Federal state subsidy
up to 8.000 € (air source heat pump)
Application to the state
both possible
Federal subsidy
up to 5,000 €, registration by 31 December 2026 at the latest
Checked
16 October 2026
No quote, no application for a public subsidy. Get quotes from up to three checked installers, free of charge and without obligation.
Vienna subsidises replacing your heating system with 35 % of eligible costs: in detached homes a maximum of 8.000 € (4.000 € more with geothermal or groundwater), in flats a maximum of 5.250 €, from its own budget and independently of federal public subsidies. Vienna sets its own technical conditions for this: the heat pump must be listed in the GET product database, and the flow temperature must not exceed 40 °C; above that, only with proof of efficiency (ηs at least 140 % at 55 °C). Income limits also apply to detached homes.
Pannonian city climate — mild winters, ideal conditions for air-to-water heat pumps. A design of 4–8 kW is sufficient for most Viennese houses.
Federal government: The new edition of Kesseltausch (boiler replacement) 2026 is open and applies to single/two-family houses and terraced houses. You can register as long as budget is available, until 31 December 2026 at the latest. Deliveries and services from 7 October 2026 are eligible for public subsidies. For a heat pump, there is a lump sum of up to 5,000 €, plus 2,500 € with a solar thermal system and 5,000 € for deep geothermal drilling or a water well. From registration, you have 9 months for installation and application. The budget is limited and is only reserved for you upon registration. Information sheet from the grant authority (checked on 16 October 2026) · What this means
Grant programmes in Vienna
Errichtung/Umstellung Heizanlagen (installation/conversion of heating systems) (City of Vienna)
up to 8.000 € (air HP)
Amount
35 % of the recognised costs
Geothermal energy
up to 12.000 €
Application
both possible
Office
Stadt Wien, Wohnbauförderung, Infopoint Wohnungsverbesserung (MA 50 / MA 25), 1200 Wien, Maria-Restituta-Platz 1
Method
Direct grant
Bonuses
Geothermal, groundwater or waste heat: 4.000 € (only for detached homes with heat sources geothermal, groundwater or waste heat, not for air-to-water heat pumps)
Instead
Flat: maximum 5.250 € (35 % of a maximum of 15.000 € eligible costs, instead of the detached home amount, without geothermal bonus)
Conditions
Replacement of a fossil heating system with a renewable system, the old system is dismantled
The new system must be the sole heating system
The flat or home to be renovated is the main residence
Flow temperature max. 40 °C, above this only with proof of ηs at least 140 % at 55 °C according to GET (see below)
Only for owner-occupied homes: income limits according to § 11 WWFSG 1989 (see below); these do not apply to flats
No own labour, lump sums or pure material costs
Flow temperature: max. 40 °C, above that only with ηs ≥ 140 % at 55 °C. Check this early — it determines eligibility for public subsidies. More on flow temperature
Income limits
1 person: 54.710 €
2 people: 81.540 €
3 people: 92.260 €
4 people: 103.000 €
each additional person: + 6.010 €
Applies only to detached homes and allotment houses, not to flats. The decisive factor is the annual net income of all persons in the household; the limits apply from 1.1.2026 and are adjusted annually.
The city recommends placing the order only after receiving written confirmation. Applying is also possible after implementation if invoices are no older than 6 months at the time of application. A deadline of 6 months applies for final billing. There is no legal entitlement; payment is subject to available budget funds. For flats, there is an additional Dekarbonisierungsprämie (decarbonisation bonus, § 18 para. 5 SanDekVO): 1.000 €, or 1.500 € in the course of an energy renovation, if the flat operates completely without gas afterwards.
Vienna requires listing. Enter the brand or model from your quote, and you will see the entry and whether the unit meets the conditions that can be checked from the data.
Federal state subsidy
Check for yourself: Flow temperature max. 40 °C, above this only with ηs ≥ 140 % at 55 °C. The design depends on your house.
Federal public subsidy („Kesseltausch“)
Check for yourself: Heating system flow temperature maximum 55 °C.
This is a preliminary check based on the GET values, not a guarantee. Further conditions can be found above under the programme; the funding agency will make the final decision.
Source: GET product database. Independent search, not an offer from the federal state or federal government.
Calculation example
Detached house in Vienna, replacing a gas boiler with an air-source heat pump (underfloor heating)
Federal state grant Vienna
8.000 €
Federal public subsidy („Kesseltausch“)
5.000 €
Can be combined
13.000 €
Federal government: Kesseltausch (boiler replacement) 2026 open, lump sum of up to 5,000 € for heat pumps, registration by 31 December 2026 at the latest. Calculated for a refrigerant with GWP below 150 (e.g. R290); for an air source heat pump with GWP between 150 and 750, you receive 20 % less, and over 750 nothing. All public subsidies combined can amount to no more than the investment costs.
Obtain quotes. With heating load calculation and all line items – without a quote, no application can be made. For the federal grant, you also need an energy consulting report from your federal state. Check right away whether the quoted appliance is listed in the GET database.
Register with the federal government, by 31 December 2026 at the latest. Only registration reserves the funds; after that you have 9 months for installation and application.
Application to the federal state before or after installation: Errichtung/Umstellung Heizanlagen (installation/conversion of heating systems, City of Vienna). The city recommends ordering only after written confirmation.
Have it installed and keep all invoices, data sheets and proofs.
Submit final accounts to the federal state. Responsible: Stadt Wien, Wohnbauförderung, Infopoint Wohnungsverbesserung (MA 50 / MA 25), 1200 Wien, Maria-Restituta-Platz 1.
How high is the heat pump grant in Vienna in 2026?
Vienna subsidises heat pumps with up to 8.000 € (air-source HP) from federal state funds (as at 16 October 2026). Vienna subsidises heating replacement with 35 % of recognised costs: up to a maximum of 8.000 € for a single-family house (4.000 € more with geothermal or groundwater), up to a maximum of 5.250 € for a flat, from its own budget and independently of federal subsidies. Vienna sets its own technical conditions for this: the heat pump must be listed in the GET product database, and the flow temperature must not exceed 40 °C, above that only with proof of efficiency (ηs at least 140 % at 55 °C). For single-family houses, income limits also apply.
Is there a federal public subsidy for replacing heating in 2026?
Yes. The new edition of Kesseltausch (boiler replacement) 2026 is open and applies to single/two-family houses and terraced houses. You can register as long as budget is available, until 31 December 2026 at the latest. Deliveries and services from 7 October 2026 are eligible for public subsidies. For a heat pump, there is a lump sum of up to 5,000 €, plus 2,500 € with a solar thermal system and 5,000 € for deep geothermal drilling or a water well. From registration, you have 9 months for installation and application. The budget is limited and is only reserved for you upon registration.
Do I have to submit the application before or after installation?
With the federal state of Vienna: both are possible. Errichtung/Umstellung Heizanlagen (construction/conversion of heating systems, City of Vienna): both are possible. With the federal government: You can install it now; deliveries and services from 7 October 2026 are eligible for public grants. You can register up until 31 December 2026 at the latest; after that, you have 9 months for installation and application.
Where do I submit the application in Vienna?
Stadt Wien, Wohnbauförderung, Infopoint Wohnungsverbesserung (MA 50 / MA 25), 1200 Wien, Maria-Restituta-Platz 1.
What are the conditions for the grant in Vienna?
Errichtung/Umstellung Heizanlagen (installation/conversion of heating systems, City of Vienna): replacement of a fossil heating system with a renewable system, the old system is dismantled; the new system must be the sole heating system; flat or single-family house to be renovated is the main residence; heat pump must be listed in the GET product database; flow temperature max. 40 °C, above that only with proof of ηs at least 140 % at 55 °C according to GET; only for single-family houses: income limits under Section 11 WWFSG 1989; they do not apply to flats; no DIY work, lump sums or pure material costs.
What flow temperature does the grant in Vienna require?
Errichtung/Umstellung Heizanlagen (installation/conversion of heating systems, City of Vienna): max. 40 °C, above that only with ηs ≥ 140 % at 55 °C. The crucial factor is the design of the heating system; this can be clarified before the quote.
Are there income limits for the grant in Vienna?
Yes, under the Errichtung/Umstellung Heizanlagen (installation/conversion of heating systems) scheme (City of Vienna): 1 person: 54.710 €; 2 persons: 81.540 €; 3 persons: 92.260 €; 4 persons: 103.000 €; each additional person: + 6.010 €. Applies only to detached homes and allotment houses, not to flats. The decisive factor is the annual net income of all persons in the household; the limits apply from 1.1.2026 and are adjusted annually.
Source: www.wien.gv.at, content checked on 16 October 2026. All information provided without guarantee — only the funding body is legally binding.
Quotes from installers in Vienna
A maximum of three checked installers, free of charge and without obligation. The installers know the federal state public grant and will help with the application.