The federal Kesseltausch (boiler replacement) grant for single-/two-family homes and terraced houses is open: you can register up to 31 December 2026 at the latest, with a flat rate of up to 5.000 Euro for a heat pump. On top of this come the public subsidies from the nine federal states. What this means specifically for your planning.
BurgenlandFederal state public subsidy up to 2.500 €, plus federal and municipal subsidies where available.Air source heat pumps up to 35 dB operating noise only need notification 14 days before construction starts; louder units require building permit proceedings; geothermal and groundwater are handled via the water rights authority.
CarinthiaFederal state public subsidy up to 4.700 €, plus federal and municipal subsidies where available.Air source heat pumps up to 45 dB sound power level are exempt under building law; for louder devices, the procedure is not clearly regulated and must be clarified with the municipality.
Lower AustriaNo separate grant from the state. What is available instead can be found on the page.Air source heat pumps up to 70 kW do not require approval, notification or reporting, except in conservation areas and historic town centres with visibility from public spaces.
Upper AustriaFederal state public subsidy up to 1.700 € (air HP), plus federal and municipal subsidies where available.Air source heat pumps are usually exempt from approval and notification, but may require approval in cases of significant disturbance to neighbours or disruption to the townscape.
SalzburgFederal state public subsidy up to 3.000 €, plus federal and municipal subsidies where available.Air source heat pumps require notification if noise limits at the neighbouring property boundary of 40 dB(A) daytime and 33 dB(A) nighttime are met, otherwise a building permit is required.
StyriaThe state public subsidy is currently suspended. What is still possible can be found on the page.Air source heat pumps require notification since 2026 with an expert confirmation of the noise level at the property boundary, otherwise a building permit is required.
TyrolFederal state public subsidy up to 9.075 € (air HP), plus federal and municipal subsidies where available.Building regulation procedure for air source heat pumps is not clearly regulated (ask the municipality); noise limits at the boundary always apply; geothermal probes almost everywhere require a water law notification procedure.
VorarlbergFederal state public subsidy up to 1.500 € (air HP), plus federal and municipal subsidies where available.Air source heat pumps up to 30 kW are exempt from approval and notification since June 2026 if set-back distances are maintained according to regulations; corner installation always requires approval.
ViennaFederal state public subsidy up to 8.000 € (air HP), plus federal and municipal subsidies where available.Air source heat pumps are often exempt from approval if noise complies with the guide and refrigerant limits are met; geothermal probes are exempt under building law, but water law clearance is required.
Federal public subsidy: registration open, until 31 December 2026 at the latest
The 2026 edition of the Kesseltausch (boiler replacement) scheme is open and applies to single-/two-family houses and terraced houses. You can register for as long as budget remains, up to 31 December 2026 at the latest. Deliveries and services from 7 October 2026 onwards are eligible for public subsidy. There is a flat rate of up to 5.000 € for a heat pump, plus 2.500 € with a solar thermal system and 5.000 € for deep geothermal drilling or a well system. From registration, you have 9 months for installation and submitting your application. The budget is limited and is only reserved for you once you register.
After that comes Kesseltausch 2027: applications from 4 January 2027 with the same flat rates, but then before installation. The Sanierungsbonus (renovation bonus) for insulation has ended for 2026; for 2027 there will be a separate application again.
Many websites still mention the 7.500 euros from before. Since the relaunch, there is a flat rate of up to 5.000 euros for heat pumps, and the former cap of 30 per cent of costs no longer applies. Anyone planning now should calculate with the new amount and not the old one.
The Förder-Manager shows which programmes apply in your federal state, how much is available, and when to submit your application — or you can go directly to your federal state's page in the table below.
New: the Förder-Manager. It uses your details to create a personal roadmap through the federal government, federal state and municipality: which public subsidy fits, what you apply for and when, which form goes to which authority, and which documents you need from the installer.
What counts alongside the federal government
State public subsidies. The federal states have their own programmes with their own budgets. Depending on the state and project, four-figure sums are possible here, and significantly more in some states.
Municipality grants are added on top in many regions and are regularly overlooked because they are hard to find.
Tax deductibility via the Öko-Sonderausgabenpauschbetrag (eco special expenses lump sum) if a federal grant has been paid out.
Prepare documents early. An Energieberatungsprotokoll (energy advice report), quote and heating load calculation require lead time. If you have them ready, you can register or submit your application on the very first day. That is what matters when a budget pot runs empty within a few months.
Federal state grants at a glance
The conditions change continuously and depend on building type, old heating system and partly on income. The table shows key details as of our last check; conditions, deadlines and a calculation example can be found on your federal state's page:
No direct grant: interest subsidy for bank loans via Eigenheimsanierung (home renovation scheme), also for pure heating replacement (around 18 % of eligible costs over 10 years).
“Last checked” means: on this date, we read the guideline of the respective funding body and cross-checked it with our information. It does not mean nothing has changed since — only the funding body itself is legally binding.
The installers in our network know the programmes of their federal state and usually handle the applications for you. Ask about this explicitly during the quote discussion — the effort required from you differs significantly depending on the company.
Your public subsidy by place of residence
Some municipalities add their own grant to the federal state's public subsidy, usually a few hundred euros. Select your federal state and municipality, and you will see the federal state and municipality with all conditions in one overview.
Choose your federal state, then you will see all public grants with their conditions at a glance.
Your public grants in Schwechat
Municipality of Schwechat
up to 600 €
Federal state of Lower Austria
no direct subsidy
Federal government
up to 5,000 €, registration by 31 December 2026 at the latest
Public grant from the municipality of Schwechat
up to 600 €
Amount
10 % of the investment costs, maximum 600 €
Application
up to 12 months after the final invoice, at the Rathaus Schwechat (town hall)
Valid since
1. December 2023
Conditions
Only when switching from a fossil heating system to a heat pump
Heat pump with a coefficient of performance (COP) of at least 3,0
Main residence in Schwechat, Rannersdorf, Mannswörth or Kledering; the house is located in the municipality
New system, installed by an installer
A federal state or federal grant is not a prerequisite, but is preferred if the budget is tight
For several combined measures, a maximum of 1.000 € in three years
Bruck an der Leitha district · checked on 1 October 2026 · the municipality is binding
Your public subsidies in Prellenkirchen
Municipality of Prellenkirchen
up to €800
Federal state of Lower Austria
no direct subsidy
Federal government
up to 5,000 €, registration by 31 December 2026 at the latest
Public subsidy from the municipality of Prellenkirchen
up to €800
Amount
20 % of the federal and state public subsidy, maximum 800 € when switching from oil or gas (maximum 400 € from other heating systems)
Application
at the Marktgemeindeamt (market town office) Prellenkirchen (Hauptplatz 7, Tel. 02145 2202) after approval from the federal or state government
Confirmed
by the municipality on 2 October 2026
Conditions
Only when switching an existing heating system to a heat pump, not in new builds
Main residence in the municipality
Calculated as a share of the federal and state public subsidy — without their approval, no municipal amount
The municipality pays 20 % of what the federal government and federal state subsidise. Lower Austria pays no direct grant, so the amount depends on the federal public subsidy („Kesseltausch“): without confirmation from the federal government, no municipal amount is granted. Check with the municipal office (Gemeindeamt) before installation.
District of Eferding · checked on 1 October 2026 · the municipality's information is legally binding
Your public subsidies in Burgenland
Federal state of Burgenland
up to 2.500 €
Federal government
up to 5,000 €, registration by 31 December 2026 at the latest
In the district of Oberwart, we have checked all 32 municipalities and found no separate public subsidy online. We have not yet checked the remaining municipalities in Burgenland individually; ask at the local Gemeindeamt (municipal office) there to see if a separate grant is available.
In addition, there is the public subsidy from the federal state of Burgenland:
Land Burgenland, Abteilung 9 (Department 9) (Europaplatz 1, 7000 Eisenstadt)
+ 500 € social bonus (net annual household income of all adults ≤ 43.000 €)
Conditions
Private individuals, owned detached/semi-detached house or terraced house (application can also be submitted by a close person with the owner's consent)
Principal residence in the house receiving the public subsidy; the application can only be submitted once registered
Replacement of a fossil heating system (oil, gas, coal/coke, night storage/direct storage heaters)
The heat pump meets the technical criteria of the EHPA Quality Label (Section 2.1), confirmed by an independent testing institute; the guideline does not require the label itself. Refrigerant GWP ≤ 2.000 (from 2027, according to the guideline, the limits of the F-gas Regulation apply)
Anyone who has received the federal grant Kesseltausch (boiler replacement) 2026 and submits the final statement receives the basic amount without further technical assessment (item 3 para. 5)
Flow temperature of the heat distribution system max. 55 °C
Heat pump under 100 kW; no possibility to connect to highly efficient local/district heating
Replacement between 01.01. and 31.12.2026
Applications are submitted after implementation, at most 12 months after the invoice date and by 31.01.2027 at the latest. The scheme ends on 31.12.2026; a follow-up regulation for 2027 has not yet been published (as of 16.10.2026). According to the guideline, the domestic hot water heat pump bonus of 300 € only applies in conjunction with a biomass central heating system and therefore does not apply to a heat pump heating system. Federal state budget 2026: 9 million €, no legal entitlement; outstanding cases from 2025 will also be processed within this budget.
Federal government: Kesseltausch (boiler replacement) 2026 open, lump sum of up to 5,000 € for heat pumps, registration by 31 December 2026 at the latest.
Your public subsidies in Carinthia
Federal state of Carinthia
up to 4.700 €
Federal government
up to 5,000 €, registration by 31 December 2026 at the latest
We haven't checked the municipalities in Carinthia individually yet. Ask at your Gemeindeamt (municipal office) if they offer their own grant.
In addition, there is the public subsidy from the federal state of Carinthia:
Heating replacement according to Richtlinie 6 (guideline 6), section B (BW-L128)
up to 3.000 €
Type
Grant
Application
after implementation
Office
Federal state of Carinthia, Abteilung 1 – Gemeinwohl, Wohnen und Sport (Department 1 – Public Welfare, Housing and Sports)
+ 1.500 € solar thermal system (thermal solar system from 6 m² gross collector area, does not need to be installed at the same time)
+ 200 € hydraulic balancing
Conditions
Heat pump according to EHPA criteria, refrigerant GWP ≤ 750, flow temperature max. 55 °C, under 100 kW
Owner-occupied home with a maximum of 2 apartments, occupied permanently and year-round as a principal residence
Building permit at least 20 years old (for energy-efficient building services 5 years from completion of construction)
Only measures started after 31.12.2025
Application after completion, exclusively via the online application portal of the federal state (the mandatory online appointment only applies to visits to the office)
Subject to available funds, in order of receipt
Guideline 6 (BW505), Section E: If the federal public subsidy is discontinued, the federal state public subsidy is 'nevertheless possible', namely under Section B. Fossil replacement invoices prior to 10.07.2026 will not be processed under Section B. This may change with the federal scheme's re-launch from November 2026: anyone registering with the federal level will presumably receive a grant under Section E according to the guideline (see below). The federal state has not yet published this (as of 16.10.2026).
Boiler replacement with federal registration (BW-L129)
up to 3.000 €
Type
Grant
Application
after implementation
Office
Federal state of Carinthia, Abteilung 1 – Gemeinwohl, Wohnen und Sport (Department 1 – Public Welfare, Housing and Sports)
+ 1.500 € solar bonus (simultaneous solar-thermal installation ≥ 6 m² gross collector area)
Conditions
Published for cases with federal registration up to 10.07.2026; whether registrations under the re-launch from 02.11.2026 also belong here has not yet been published by the federal state (obvious under the guideline)
Application to the federal state only with the payment confirmation letter from KPC (federal level) and the invoices
So far, this route has only been published for cases that were registered with the federal level by 10.07.2026. For registrations under the federal re-launch from 02.11.2026, it is logical according to the guideline: 3.000 € plus 1.500 € solar bonus, without the 200 € for hydraulic balancing, application to the federal state after payout by KPC. The federal state has not yet confirmed this (as of 16.10.2026). Without a federal public subsidy, Section B applies (above).
Federal government: Kesseltausch (boiler replacement) 2026 open, lump sum of up to 5,000 € for heat pumps, registration by 31 December 2026 at the latest.
Your public subsidies in Lower Austria
Federal state of Lower Austria
no direct subsidy
Federal government
up to 5,000 €, registration by 31 December 2026 at the latest
Select your municipality above if it is in the list. So far we have checked all municipalities in the districts of Bruck an der Leitha and Wiener Neustadt; the remaining ones there have no separate public subsidy online. For other municipalities, it is worth asking at the local Gemeindeamt (municipal office).
In addition, there is the public subsidy from the federal state of Lower Austria:
Wohnbauförderung Eigenheimsanierung (housing subsidy for home renovation)
4 % per year over 10 years
Type
Interest rate subsidy for the loan
Application
both possible
Office
Land NÖ Wohnbauförderstelle (Lower Austria housing subsidy office)
Conditions
Option WITH Energieausweis (energy performance certificate): at least 40 % improvement in heating demand (HWB)
Replacing heating system eligible for a grant even as an individual measure without Energieausweis (energy performance certificate) (25 basic points, heat pump 15, switching from fossil fuel 5, converting from individual stoves to central heating 5, with heat pump only with max. 40 °C flow temperature; max. 50 combined)
Heat pump with type test and EHPA quality label, flow temperature max. 55 °C, SCOP at least 3.5 (air-to-water) or 4.1 (brine-to-water, water-to-water)
Subsidised via a bank loan: Without a loan in the amount of the eligible costs, the grant is reduced; without any loan, no grant is provided
Points system: max. 140 points, up to 195 with location quality; recognised costs max. 78.000 €
Can be combined with insulation, PV, ventilation
No direct grant: The federal state pays a subsidy towards repayments of your bank loan for 10 years, totalling around 18 % of the recognised costs for a pure heating replacement (maximum 600 € per m² for up to 130 m²). Application at the latest one year after start of construction.
„Sauber Heizen für Alle“ (Clean Heating for All) with Lower Austria top-up
ended in 2026
Type
Income-dependent public subsidy
Application
before implementation
Office
Land NÖ (registration) → KPC (federal funding agency)
Conditions
No new registrations since 10.07.2026; the re-launch of Kesseltausch (boiler replacement) does not include this scheme
Anyone registered by then retains the reservation for 9 months
Until then, the following applied: income limit 1.867 €/month net (single-person household), ownership of a detached/semi-detached house or terraced house, principal residence, replacement of a fossil heating system
Up to 100 % of the costs from federal, state and additional public subsidies were funded; for an air-to-water heat pump up to a maximum of 25.586 € according to the guideline (the federal state website mentions 25.383 €). It is not known whether there will be a new round in 2027.
Federal government: Kesseltausch (boiler replacement) 2026 open, lump sum of up to 5,000 € for heat pumps, registration by 31 December 2026 at the latest.
Your public subsidies in Upper Austria
Federal state of Upper Austria
up to 1.700 € (air source heat pump)
Federal government
up to 5,000 €, registration by 31 December 2026 at the latest
Select your municipality above if it is in the list. So far we have checked all municipalities in the district of Eferding; the remaining ones there have no separate public subsidy online. For other municipalities, it is worth asking at the local Gemeindeamt (municipal office).
In addition, there is the public subsidy from the federal state of Upper Austria:
Förderprogramm für Wärmepumpen (heat pump subsidy programme, federal state of Upper Austria)
up to 1.700 € (air source heat pump)
Type
Grant, max. 50 % of the recognised costs
Geothermal energy
up to 2.800 €
Application
after implementation
Office
Land Oberösterreich (State of Upper Austria), Abteilung Umweltschutz (Environmental Protection Department)
Conditions
100 € per kW rated heat output (geothermal and water-to-water: 170 € per kW, maximum 2.800 €)
Private (detached/semi-detached house, max. 2 flats, main residence)
Replacement of fossil heating
Design flow temperature max. 55 °C, ηs proof depending on design (see below)
EHPA quality label or compliance with its criteria, refrigerant GWP ≤ 750, ID from the GET product database in the data sheet
Smart grid capability (“SG Ready”) via manufacturer confirmation
For air source heat pumps: max. 35 dB specific noise immission (Lr,spez) at the neighbour's property line
Combination requirement: PV ≥ 3 kWp OR solar thermal ≥ 6 m² OR 10 years of 100 % green electricity
Hydraulic balancing mandatory; heat and electricity meters for the SPF (JAZ) calculation
No connection to renewable local/district heating possible within a radius of 35 m
New buildings excluded
Geothermal and water-to-water: 170 € per kW, maximum 2.800 € (with higher ηs). Valid from 01.01. to 31.12.2026 subject to available funds; the federal state has not yet published if and how it will continue in 2027 (as of 16.10.2026). Can be combined with the federal public subsidy (Kesseltausch). Information: Abteilung Umweltschutz (Environmental Protection Department), phone (+43 732) 77 20-134 83.
Federal government: Kesseltausch (boiler replacement) 2026 open, lump sum of up to 5,000 € for heat pumps, registration by 31 December 2026 at the latest.
Your public subsidies in Salzburg
Land Salzburg (federal state of Salzburg)
up to 3.000 €
Federal government
up to 5,000 €, registration by 31 December 2026 at the latest
We haven't checked the municipalities in Salzburg individually yet. Ask at the Gemeindeamt (municipal office) if there is a separate grant.
In addition, there is the public subsidy from the federal state of Salzburg:
Erneuerbare Zentralheizungen (renewable central heating systems, standardised 2026)
up to 3.000 €
Type
Grant, max. 40 % of the costs
Application
after implementation
Office
Land Salzburg (federal state of Salzburg)
Conditions
Complete replacement of a heating system using oil, gas, coal or coke or a direct electric heating system
Only existing buildings (no new buildings)
Flow temperature max. 55 °C
The system must be the only central heat supply
No reasonable connection to climate-friendly district heating possible
Registration exclusively online via the funding portal of the federal state (sbg.foerdermanager.net); from then on, the money is reserved for 9 months
With federal public subsidy: Application to the federal state only after its payout, within 6 months of payout notification from KPC and at the latest 9 months after registration, without extension
Without federal public subsidy when replacing a fossil heating system, only if registration with the federal level was not possible at the time of installation
Budget almost exhausted: On 16.10.2026, the funding portal of the federal state showed 'Currently 21 registrations still possible'. Registration reserves the funds for 9 months; completion and application must be finalised by then, with no extension possible. Without a federal public subsidy, the application is possible up to 6 months after the final invoice. Federal state and federal government combined maximum 75 % of costs.
Federal government: Kesseltausch (boiler replacement) 2026 open, lump sum of up to 5,000 € for heat pumps, registration by 31 December 2026 at the latest.
Your public subsidies in Styria
Federal state of Styria
currently suspended
Federal government
up to 5,000 €, registration by 31 December 2026 at the latest
We haven't checked the municipalities in Styria individually yet. Ask at your Gemeindeamt (municipal office) whether they offer their own grant.
In addition, there is the public subsidy from the federal state of Styria:
Public subsidy for heat pumps (heating replacement)
currently suspended
Type
Grant
Application
before implementation
Office
Federal state of Styria
Conditions
Applications are currently not possible for switching from a fossil heating system to a heat pump
According to the federal state, no public subsidy for the foreseeable future; applications already submitted will continue to be processed
The federal public subsidy („Kesseltausch“) applies independently of the federal state. „Sauber Heizen für Alle Steiermark“ (Clean Heating for All Styria): registration currently not possible. Some municipalities have their own public subsidies; it is worth asking at the municipal office (Gemeindeamt).
Replacement of renewably operated heating systems (Umweltlandesfonds - Environmental State Fund)
up to 1.500 €
Type
Grant, lump sum, maximum 30 % of costs
Application
before implementation
Office
Land Steiermark, Referat Energietechnik und Umweltförderungen (Umweltlandesfonds)
Conditions
Only when replacing a heat pump or biomass heating system at least 15 years old, not when switching from oil, gas or electricity
Private individuals, existing detached/semi-detached house or terraced house
Heat pump on the federal state's list of eligible devices, EHPA criteria, refrigerant GWP ≤ 750, flow temperature max. 55 °C
Air source heat pump with refrigerant GWP between 150 and 750: 20 % less
Not in addition to the federal Kesseltausch (boiler replacement)
Application online before delivery and installation, by 31.12.2026 at the latest
Budget 2026: 700.000 €, according to the federal state 27 % still available on 06.10.2026. From the confirmation letter with reference number, you have 9 months to install the system and submit the completion notice.
Federal government: Kesseltausch (boiler replacement) 2026 open, lump sum of up to 5,000 € for heat pumps, registration by 31 December 2026 at the latest.
Your public subsidies in Tyrol
Federal state of Tyrol
up to 9.075 € (air source heat pump)
Federal government
up to 5,000 €, registration by 31 December 2026 at the latest
We haven't checked the municipalities in Tyrol individually yet. Ask at your Gemeindeamt (municipal office) whether they offer their own grant.
In addition, there is the public subsidy from the federal state of Tyrol:
Wohnhaussanierungs-Bonus klimafreundliche Heizsysteme (residential renovation bonus for climate-friendly heating systems)
up to 9.075 € (air source heat pump)
Type
Grant
Geothermal energy
up to 13.075 €
Application
after implementation
Office
Bezirkshauptmannschaft (district administrative authority) of the district; Innsbruck-Stadt: Stadtmagistrat Innsbruck; Innsbruck-Land: Amt der Tiroler Landesregierung, Abteilung Wohnbauförderung (form A5 with confirmation from the Gemeinde [municipality])
+ 3.000 € climate-friendly system bonus (only when replacing oil, gas, coal/coke or electricity, including direct storage heaters, with proof of disposal)
+ 750 € efficient hot water preparation (25 % of maximum 3.000 €, e.g. cylinder from efficiency class B)
Conditions
Application using paper form A5, confirmed by the Gemeinde (municipality); an Energieausweis (energy performance certificate) and ID Austria are not required for this
Cost cap air source heat pump 21.300 € (up to 5.325 €), ground source/water 37.300 € (up to 9.325 €)
The heat pump meets the criteria of the EHPA-Gütesiegel (EHPA quality label), confirmed by an independent testing institute (the guideline itself does not require the label); refrigerant GWP ≤ 2.000; verified via the entry in the GET-Produktdatenbank and the federal state's list
Flow temperature max. 50 °C for air-to-water heat pumps, 55 °C for brine-to-water and water-to-water heat pumps (see below)
No combination with fossil fuels (hybrid ban)
Building permit at least 10 years old; main residence (no holiday/second homes)
Application up to 18 months after invoicing. Ground source and groundwater heat pumps have a higher cost cap: basic public grant up to 9.325 €, with bonus and hot water up to 13.075 €. Public grants from other bodies, such as the federal Kesseltausch (boiler replacement), are deducted according to guidelines (item 4.5), unless explicitly granted as an additional public grant; whether the federal state deducts the federal amount has not been clarified. For new builds, the Wohnbauförderungsrichtlinie (housing subsidy guideline) with a maximum design flow temperature of 40 °C applies instead of the renovation guideline. The additional TIWAG bonus requires membership in the 'Netzwerk Wärmepumpe Tirol' and is therefore not available for every device. As an alternative to the one-off grant, an annuity subsidy (35 % of the initial load) is available.
Federal government: Kesseltausch (boiler replacement) 2026 open, lump sum of up to 5,000 € for heat pumps, registration by 31 December 2026 at the latest.
Your public subsidies in Vorarlberg
Federal state of Vorarlberg
up to 1.500 € (air source heat pump)
Federal government
up to 5,000 €, registration by 31 December 2026 at the latest
We haven't checked the municipalities in Vorarlberg individually yet. Ask at your Gemeindeamt (municipal office) whether they offer their own grant.
In addition, there is the public subsidy from the federal state of Vorarlberg:
Amt der Vorarlberger Landesregierung (Office of the Vorarlberg State Government), Fachbereich Energie und Klimaschutz (Energy and Climate Protection Department)
+ 500 € bonus for replacing fossil heating (already halved rate for air-to-water heat pumps, full rate 1.000 €)
Conditions
Main residence, private use, existing building
The heat pump meets the technical criteria of the EHPA Quality Label (Section 2.1), confirmed by an independent testing institute; the guideline itself does not require the label itself. Refrigerant GWP ≤ 2.000
Listed in the GET database (the state's device list is a GET query)
Air-to-water heat pump: sound power level LWAmax according to GET max. 55 dB; up to 60 dB only with manufacturer's declaration on throttling, acoustic hood or indoor installation; over 60 dB not eligible for a grant
Air-to-water heat pumps up to 30 kW mostly no longer require planning permission since 13.06.2026 (exempt development if distances comply with regulations); otherwise, the planning permission notice from the Gemeinde (municipality) must be included with the application
Heat meter + separate electricity meter to check the seasonal performance factor
Public subsidy additionally capped at 25 % of the eligible costs
No flow temperature requirement from the federal state; the 55 °C limit is a condition of the federal public grant
Application up to 6 months after commissioning, 31.12.2026 at the latest; the 6-month deadline is capped by this end date. Guidelines for 2027 have not yet been published (as of 16.10.2026). There is no advance reservation and no legal entitlement: if the federal state fund is empty when applying, no public grant will be paid. Federal state budget 2026 according to the federal state approximately 3,6 million €.
Federal government: Kesseltausch (boiler replacement) 2026 open, lump sum of up to 5,000 € for heat pumps, registration by 31 December 2026 at the latest.
Your public subsidies in Vienna
Federal state of Vienna
up to 8.000 € (air source heat pump)
Federal government
up to 5,000 €, registration by 31 December 2026 at the latest
In Vienna, the city is also the federal state. Apart from the city's public subsidy, there is no separate municipal grant.
In addition, there is the public subsidy from the federal state of Vienna:
Errichtung/Umstellung Heizanlagen (installation/conversion of heating systems) (City of Vienna)
up to 8.000 € (air source heat pump)
Type
Grant, 35 % of the recognised costs
Geothermal energy
up to 12.000 €
Application
both possible
Office
Stadt Wien, Wohnbauförderung, Infopoint Wohnungsverbesserung (MA 50 / MA 25), 1200 Wien, Maria-Restituta-Platz 1
+ 4.000 € geothermal energy, groundwater or waste heat (only for owner-occupied homes with heat source geothermal energy, groundwater or waste heat, not for air-to-water heat pumps)
Flat: maximum 5.250 € (35 % of maximum 15.000 € recognised costs, instead of the home ownership amount, without geothermal bonus)
Conditions
Replacement of a fossil heating system with a renewable system, the old system is dismantled
The new system must be the sole heating system
The flat or home to be renovated is the main residence
The heat pump must be listed in the GET product database
Flow temperature max. 40 °C, above this only with proof of ηs at least 140 % at 55 °C according to GET (see below)
Only for owner-occupied homes: income limits according to § 11 WWFSG 1989 (see below); these do not apply to flats
No own labour, lump sums or pure material costs
The city recommends placing the order only after receiving written confirmation. Applying is also possible after implementation if invoices are no older than 6 months at the time of application. A deadline of 6 months applies for final billing. There is no legal entitlement; payment is subject to available budget funds. For flats, there is an additional Dekarbonisierungsprämie (decarbonisation bonus, § 18 para. 5 SanDekVO): 1.000 €, or 1.500 € in the course of an energy renovation, if the flat operates completely without gas afterwards.
Federal government: Kesseltausch (boiler replacement) 2026 open, lump sum of up to 5,000 € for heat pumps, registration by 31 December 2026 at the latest.
Order of steps for 2026: installation can already be done, register by 31 December at the latest
Quote and energy advice. Obtain quotes with heating load calculation and complete your federal state's Energieberatung (energy advice); without an advice report, registration with the federal government is not possible.
Installation is already possible now. The federal government subsidises goods and services from 7 October 2026, even if the heat pump is installed before registration.
Register with the federal government, by 31 December 2026 at the latest. Only then is the money reserved for you. You then have 9 months for installation and submitting the application.
Federal state: before or after installation depending on the programme. When and where you apply to the federal state is listed on your federal state's page in the table above.
The budget for the new edition is limited and only reserved upon registration. Anyone installing early should therefore already have the registration documents ready.
What has recently changed
Public subsidy programmes often change without notice — and you usually only notice when an application is rejected. That is why we keep track of what we have noticed:
Federal government: Kesseltausch 2026 (relaunch)
The terms of the relaunch are official: registration from 2 November 2026, at the latest until 31 December 2026, services from 7 October 2026 are eligible for public subsidy. Instead of 30 % of costs, there are flat rates, up to 5.000 € for heat pumps.
With the federal freeze, new registrations for „Sauber Heizen für Alle" (Clean Heating for Everyone) with the Lower Austria top-up have also been suspended; existing registrations remain reserved.
The 2026 federal budget for Kesseltausch was exhausted; new registrations were not possible until the re-launch. “Sauber Heizen für Alle” 2026 (clean heating for all) therefore also ended and remains closed.
umweltfoerderung.at — processing via the Kommunalkredit Public Consulting (KPC)
The respective state portal of your federal state for the state public subsidy
All information subject to change, as of 8 November 2026. Grant programmes, budgets and conditions can change at short notice. Only the respective granting body is binding.
Have your documents ready before the budget runs out
A quote and heating load calculation need some lead time. Up to three installers will calculate your project free of charge.